Bellview Port, Waterford

The project involved extending the wharf at Bellview Port.

Ascon had driven piles to rock head through the water, which meant  we were required to install ground anchors to give additional stability in the event of a ship colliding with them.

Ascon drove the circular steel piles and we worked off a drilling platform fastened to the piles. Our drilling rig was craned on and drilled and installed 7 No. 50m Dywidag ground anchors. We were required to drill down through the pile to the seabed and continue drilling through the seabed to a total depth of 50m and install the large anchors.

We were working with very limited space and the normal health and safety concerns of working over water, making this a complex project.

Additionally, a variety of challenges arose during the project that could have thrown the project off-schedule.

However, we worked with Ascon to develop solutions, enabling us to successfully install and tension the anchors and fully complete the project within a 2 week period – ahead of schedule and on-budget. 

Technical:

  • Atlas Copco Mustang A52 drilling rig – capable of drilling in marine environment with track record of installing ground anchors for dolphins
  • Albion designed ground anchors
  • Dywidag Permanent Monobar Anchors
  • Atlas Copco Symmetrix simultaneous drilling and casing system
  • Installed 50m ground anchors in order to anchor down driven piled casing
  • Ground anchors were 7 strand Dywidag with working load 1000KN into 10m rock socket

<<<Back to case studies

 

Albion Waterford case study image

Type of Work: 
Marine Drilling and Anchoring

Client: 
Ascon

Scale & Duration: 
€95,000 and 2 weeks