Rail Projects 1

Somerton Embankment

Client: Birse Rail                                                       Value: £300,000                                                   Duration: 8 weeks

Slope stabilisation including soil nails, site clearance, earthworks and drainage. Gabion works were undertaken between the the existing railway and canal infrastructure

 

 

Harvil Road Embankment, London

Client: Birse Rail                                                       Value: £250,000                                                   Duration: 16 weeks

Design & build stabilisation of failed embankment for Network Rail including site clearance, earthworks, drainage, soil nailing, surface protection and track-side monitoring

 

 

 

Channel Tunnel Rail Link - 440

Client: Balfour Beatty                                                  Value: £380,000                                                   Duration: 10 weeks

Design, supply and installation of 28m long ground anchors to secure sheet piled wall. Also to supply and install soil nails and netting.

 

 

 